Changes

Jump to navigation Jump to search
109 bytes added ,  05:18, 8 December 2012
Line 425: Line 425:  
:*Step one.  Packages created in smetest should be summarely tested by the developer to ensure that it installs correctly. Particular attention should be given to accurate changelog including a reference to the bug report. The bug is then resolved FIXED, and a copy of the changelog including package name provided at time of resolution.
 
:*Step one.  Packages created in smetest should be summarely tested by the developer to ensure that it installs correctly. Particular attention should be given to accurate changelog including a reference to the bug report. The bug is then resolved FIXED, and a copy of the changelog including package name provided at time of resolution.
   −
:*Step two. The package can then be moved by the developer to smeupdates-testing. In practice, members of the updatesteam should ensure that the move has been done, and move all relevant packages on a weekly basis.
+
:*Step two. The package can then be moved by the developer to smeupdates-testing. Essentially if you can find an older package in smeos then the package should be moved to smeupdates-testing. In practice, members of the updatesteam should ensure that the move has been done, and move all relevant packages on a weekly basis.
    
:*Step three.  Verification takes place, the bug is either REOPENED or resolved VERIFIED. Updatesteam to circulate request for comment about release after having ensured that all deps are satisfied. This could be scheduled in batch weekly unless urgent fix.  
 
:*Step three.  Verification takes place, the bug is either REOPENED or resolved VERIFIED. Updatesteam to circulate request for comment about release after having ensured that all deps are satisfied. This could be scheduled in batch weekly unless urgent fix.  

Navigation menu